3 Warehouse building standards
3.4.2 Warehouse structure. The warehouse shall be an integral reinforced concrete cast-in-situ structure on the six sides of the wall, roof and bottom plate.
3.4.4 Load capacity. The unit load of the floor floor is ≥6000 kg per square meter, and the load of the non-floor floor is ≥3000 kg per square meter.
3.4.6 Wall structure. Commercial concrete above C50 should be used for the walls, top and bottom plates of the vault, and on-site mixed concrete should not be used. The wall thickness is ≥250mm, with threaded steel bars over 14mm in diameter, double-layer bidirectional steel bars are arranged in a mesh pattern , and the steel bar spacing is ≤150mm×150mm. The wall standard should approach the prevention index of the main security layer of the warehouse door, and have anti-explosion, anti-drilling and other anti-theft properties . The ventilation device in the warehouse turns in the wall and is not easy to be directly transparent. The distance from the high ground at the exit of the wall shall not be less than 2500mm, the diameter is ≤200mm, and the air outlet is downward and should be protected by steel mesh. The basement building should be a double-walled cloister type, with a clear width of 600-800 mm in general, running through on all sides, and installing refraction devices at the corners .
3.4.7 Warehouse enclosure clean field. The warehouse shall not face the street or be built directly to the outside, and shall not build any buildings around the warehouse, and the distance between the walls and other buildings shall not be less than 6 meters
3.4.9 Waterproof. Polymer waterproof materials should be used for the roof waterproofing to prevent water leakage and dampness and ensure the durability of waterproofing. Underground waterproofing should take multiple fortifications, and comprehensively use measures such as surrounding rock waterproofing, structural waterproofing, and ground drainage.
5 Safety precautions
5.2 Alarm system: The alarm equipment should be installed in a concealed position in the protective area, which is convenient for maintenance and has the function of anti-vandalism.
5.2.1 The alarm system should have audible and visual displays and can accurately indicate the location of the alarm.
5.2.2 The manually triggered alarm device should have measures to prevent malfunction.
5.3 TV monitoring system: The treasury shall be equipped with TV monitoring equipment. Among them, the warehouse, guard room, ticket processing site, inbound and outbound transfer site, and main passages shall carry out real-time and uninterrupted video and audio recording during operation. During non-operation period, it should be able to automatically start lighting, audio and video equipment while receiving alarm signals. , And send out sound and light alarm .
5.4 Alarm center control system: It shall have the function of simultaneously controlling the TV monitoring system and the alarm system. The energy recognition function should immediately recognize the location and nature (robbery, theft, fire accident) and display it on the screen while receiving the signal; the recording function should display the alarm time and disposal plan, and print the record. The central control system should have wired and wireless communication equipment connected to the public security organ "110" alarm network.
5.6 Weapons and ammunition: Treasury guards should be equipped with full-time guards, and they should be equipped with weapons in accordance with the "Measures for the Provision of Guns for Official Use" .